Service planning for EV charging

Plan the power connection behind your charging project.

EV charging utility design connects the proposed charging layout with the electric service needed to support it. The work considers where power will enter the site, how utility routes fit existing conditions and what information the serving utility needs to review the project.

1 America Utility Design helps organize this work through utility layouts, drawing preparation and coordination with the project team. We use the proposed charger information and electrical requirements supplied by the owner, equipment provider and electrical designer to support service planning for commercial properties, workplaces, multifamily developments and fleet facilities.

Early planning also considers future charging phases. Bringing the intended charger locations, service requirements and expansion plans into the discussion helps the team identify utility questions before the site layout is finalized.

EV charging design & coordination

What our service can include

The scope is based on your proposed charging equipment, site conditions and the utility service information needed to develop the project.

Site information & charging requirements

Review available site plans, existing utility information and the proposed charging arrangement. Gather charger specifications, planned quantities and load information supplied by the project’s electrical designer. Identify missing information and discuss initial and future charging needs so the utility planning work reflects how the owner intends to use the site.

Electric service & utility coordination

Coordinate service questions with the serving electric utility and the project team, as included in the agreed scope. Organize information about the proposed electrical demand, existing service and desired charging locations. Track utility responses about potential connection points, service arrangements and additional information needed to evaluate the project and advance planning.

Utility routes & equipment locations

Develop proposed utility routes and equipment locations around the charging area and wider site plan. Consider the relationship between utility connection points, equipment space, parking, buildings and existing utilities. Coordinate layout questions with the electrical designer and other project consultants so proposed routes reflect the information available at that stage.

Drawing updates & future phases

Prepare the agreed utility drawings and incorporate project-team comments, utility direction and updated equipment information. Where expansion is planned, identify future phases and related routing or equipment-space considerations in the layout. Keep current and future work clearly distinguished, with unresolved decisions recorded for the project team to address as planning proceeds.

Printed architectural plans with drafting pencils, rulers and other drawing tools

Utility layouts & drawing deliverables

Drawings for a coordinated charging project.

Depending on the agreed scope, deliverables may include:

  • Site utility layouts showing proposed routes and connection points
  • Proposed utility equipment locations coordinated with the charging layout
  • Drawing notes identifying relevant existing facilities and coordination items
  • Revisions incorporating agreed utility direction and project-team comments
  • CAD and/or PDF files in the formats specified in your proposal

Our electric utility service design service supports related service planning. Where existing utilities affect the proposed layout, utility survey and existing utility drafting can help develop the information used for coordination. Joint trench design and composite plans can support layouts involving several utilities.

Your proposal defines the design and coordination tasks included. The serving utility determines available capacity and final service requirements. Electrical engineering, permitting and installation responsibilities are established with the project team.