1 America Utility Design

Utility Design
Resources

A practical starting point for your project. Use the checklist, service guide and official utility links below to organize your information and identify the next step for your site.

Drafting professional working on a printed plan with a pencil and ruler

Project checklists · Service guidance · Utility resources

Surveyor recording field information with a total station

Project information checklist

What to send with your inquiry

You do not need every item before contacting us. Start with the information you have so we can discuss your project and define the next step.

  • Project location. Address, parcel information if available, and the utility serving the property.
  • Proposed work. A short description of the development, service change, survey area or drawing request.
  • Available plans. Current site plans, civil drawings, architectural plans, surveys and relevant CAD files.
  • Electrical information. Available load information, single-line drawings, panel schedules and proposed meter or equipment locations.
  • Existing utility information. Utility records, earlier drawings, field notes, photographs and project-team markups.
  • Correspondence and schedule. Utility project numbers, review comments, target dates and known site-access constraints.

Service selection guide

Find the right starting point.

Use the situations below to explore the service that best fits your project. We can discuss a combined scope when your project needs more than one type of support.

Need field information about existing utilities?

Explore Utility Survey to discuss documenting selected visible and accessible utility features within an agreed project area.

Have records that need to become drawings?

Explore Existing Utility Drafting. Available survey files, field notes, utility records and markups can form the basis of an organized existing-utility plan.

Planning EV charging infrastructure?

Explore EV Charging Utility Design. Start with the proposed charger locations, available electrical information and site layout.

Official utility resources

Find information from your serving utility.

Use these official links for application guidance, required information and service standards. Share any project-specific utility instructions with your inquiry.

Official resource links open the utility’s website in a new tab. Check the utility’s current documents and any instructions issued for your project.

Looking for applicant design support from 1 America Utility Design? Explore our SCE service. Our SDG&E and PG&E services are planned; contact us about availability.

Common questions before you get started

Do I need a complete plan set before contacting you?

No. Send the project address, a description of the work and the documents you have. We can discuss missing information and the service scope appropriate for your current project stage.

What is the difference between utility survey and existing utility drafting?

Survey collects field information about selected utility features. Drafting organizes available survey information, records and notes into drawings. A project may need either service or both. Surface observations and record-based drawings do not independently confirm buried utility routes or depths.

Does a design proposal include utility approval or construction?

The proposal defines the design, documentation and coordination included in the assignment. Utility review, agency requirements and construction arrangements are addressed separately. Share existing review comments and project instructions so those responsibilities can be discussed early.