1 America Utility Design

Joint Trench Design
& Composite Plans

Coordinate utility routes before installation begins. We prepare joint trench layouts and composite utility plans to help your project team review proposed routes, equipment locations and connections across the site.

Construction crew working beside a trench in a paved street

Utility routes, planned together

See how the utilities fit your site.

Joint trench design coordinates the arrangement of participating utilities within a shared trench where the serving utilities permit it. A utility composite plan brings available utility layouts onto one drawing so the project team can review routes, crossings and equipment locations together.

A composite plan can show shared-trench facilities alongside utilities that follow separate routes. That broader view helps the team understand how utility layouts relate to buildings, driveways, landscaping, drainage and other planned site improvements.

1 America Utility Design helps developers, property owners, architects and contractors organize this information into coordinated drawings. The scope can support new development, redevelopment, service improvements and utility relocation. Our dry utility design and coordination service can support the wider planning effort.

Joint trench layouts & utility composites

What our service can include

The scope is based on your site plans, the participating utilities and the information needed to coordinate their proposed layouts.

Site plans & utility information review

Review available site plans, existing utility information and layouts supplied by the project team or utility providers. Confirm the utilities involved, the proposed service requirements and the information needed to develop the coordinated layout.

Joint trench routes & layouts

Develop proposed trench alignments and coordinate connection points, equipment locations and applicable trench details. Review the arrangement against the site layout and participating utilities’ requirements, with questions identified for the appropriate project or utility contact.

Composite plans & conflict review

Bring available utility layouts onto a common project background. Show relevant existing and proposed features, identify potential crossings or overlapping layouts, and highlight areas where the team needs to resolve routing, equipment access or missing information.

Coordination, comments & revisions

Work through layout questions with the project team and participating utility contacts, as included in the scope. Incorporate agreed comments and updated information so the trench and composite drawings stay aligned with the developing site plans.

Drafting professional reviewing a printed plan with a pencil and ruler

Drawings for coordinated review

A coordinated view of the proposed utilities.

Depending on the agreed scope, deliverables may include:

  • Proposed joint trench routing and related layout drawings
  • Composite plans showing the participating utility layouts
  • Applicable trench sections, detail references and drawing notes
  • Coordination items and revisions based on review comments
  • CAD and/or PDF files in the formats specified in your proposal

Where existing information is incomplete, utility survey and existing utility drafting can help establish the drawing background. The coordinated layout can also support electric utility service design as service routes and equipment locations develop.

Trench arrangements and final details depend on the participating utilities’ requirements and approvals. Composite plans reflect the available project information; existing utility locations and depths may require additional field verification.

Joint Trench Design & Composite Plans by Location

Explore the local service pages below for more information about joint trench design and utility composite plans in your area.